Flowchart For Aluform Work At Site


ACTIVITY FOR THE FLOW CHART NUMBERS

1. Receive Aluform materials.
     1a. Packing list, BOQ, and Formwork layout.
     1b. Tools.
     1c. Additional accessories.

2. Visual inspection.
     2a. Packing list & schemes.
     2b. Acceptance criteria.

3. Inform concern for any defects.
     3a. Details of report.

4. Collect modification details.
     4a. Fabrication drawings.

5. Stock the material as per packing list.

6. Room wise segregation.

7. Dry mock-up.
     7a. Schemes.

8. Room wise numbering for identification.

9. Dismantling of mock-up.

10. Setting out.

11. Shift to work location.

12. Shift to stock yard.

13. Actual assembly at work location.

14. Slab rebars & M&E works.

15. Final checking (Pre pour check)
     15a. Check list.

16. Concreting.
     16a. Pour card.

17. Post pour check.

18. Leveling and finishing.

19. De-shuttering.
     19a. Removing pins and wedges.
     19b. Removing wall ties.
     19c. Removal of wall panels.
     19d. removal of deck panels.

20. Cleaning of panels.

21. Fixing of working platforms with brackets.

22. Erection of safety posts/rails.

23. Applying form release agent.

_________________________________________________________________________________

Official Website  

Official Website

Download OfficialApp

Download App For Interview

YouTube Channel

Facebook Page

Twitter

Pinterest

Instagram

Google plus

Email Id